* WGs marked with an * asterisk has had at least one new draft made available during the last 5 days

Adslmib Status Pages

ADSL MIB (Concluded WG)
Ops Area: Robert Wilton, Warren Kumari | 1998-May-28 — 2014-Jan-06 
Chairs
 


2013-09-20 charter

ADSL MIB (adslmib)
------------------

 Charter

 Current Status: Active

 Chair:
     Menachem Dodge <menachemdodge1@gmail.com>

 Operations and Management Area Directors:
     Benoit Claise <bclaise@cisco.com>
     Joel Jaeggli <joelja@bogus.com>

 Operations and Management Area Advisor:
     Benoit Claise <bclaise@cisco.com>

 Editors:
     Edward Beili <edward.beili@actelis.com>
     Moti Morgenstern <moti.Morgenstern@ecitele.com>
     Scott Baillie <scott.baillie@nec.com.au>
     Umberto Bonollo <umberto.bonollo@nec.com.au>

 Mailing Lists:
     General Discussion: adslmib@ietf.org
     To Subscribe:       https://www.ietf.org/mailman/listinfo/adslmib
     Archive:            http://www.ietf.org/mail-archive/web/adslmib/

Description of Working Group:


    The working group will define:

    1. A set of managed objects to handle the bonding of xDSL lines
    according to the ITU-T Recommendations G.998.1 (ATM), G.998.2 (Ethernet)
    and G.998.3 (TDIM). A common MIB module will be developed to handle the
    common objects and three specific MIB modules will be developed to
    handle the three separate layer-2 technologies. Use will be made of the
    ifStack and ifInvStack Tables defined in RFC 2863 and RFC 2864
    respectively. Use will also be made of the ifCapStack and ifInvCapStack
    tables as defined in RFC 5066. The Broadband forum TR-159 will be used
    in the definition of these MIBs.

    2. The working group will develop a set of managed objects as an
    optional extension to RFC 5650 that shall provide an alternative
    approach, known as the "Vector of Profiles", for the configuration of
    DSL lines. The Vector of Profiles MIB will be based on the Broadband
    Forum TR-165 document. The ITU-T G.997.1 will also be considered in the
    definition of this extension.

    The MIB modules defined by this group will be generated using SMIv2,
    will be consistent with the SNMP management framework, and will
    describe the relationship of the objects defined to existing MIBs such
    as those described in other work products of this Working Group, the
    interfaces MIB, the Ethernet MIB modules and the AToM MIB.




Goals and Milestones:
  Done     - Submit Internet-Draft to cover subscriber equipment
  Done     - Meet at Chicago IETF to review Internet-Drafts
  Done     - Submit Internet-Draft to IESG for consideration as Proposed Standard.
  Done     - Meet at Oslo IETF to review new Internet-Drafts and discuss implementation experience on initial MIB
  Done     - Submit supplementary Internet-Draft to IESG for consideration as Proposed Standard.
  Done     - Produce Internet-Draft covering HDSL2 management objects.
  Done     - Submit updated HDSL2/SHDSL Internet-Draft
  Done     - Complete WG last call for HDSL2/SHDSL management objects
  Done     - Collect implementation reports for ADSL MIB
  Done     - Submit HDSL2/SHDSL MIB to IESG for consideration as Proposed Standard
  Done     - Submit initial Internet-Draft VDSL MIB
  Done     - Complete WG last call on VDSL MIB
  Done     - Submit updated VDSL MIB Internet-Draft
  Done     - Submit final VDSL MIB Internet-Draft
  Done     - Submit VDSL MIB to IESG for consideration as Proposed Standard
  Done     - New WG I-Ds for the LCS MCM and SCM MIB modules
  Done     - Initial WG Internet-Draft covering ADSL2 management objects
  Done     - Integrate working group changes and produce revised draft
  Done     - Complete WG last call on ADSL2 MIB
  Done     - Submit ADSL2 MIB to IESG for consideration as Proposed Standard
  Done     - Re-charter or close down
  Done     - Initial WG Internet-Draft covering VDSL2 management objects
  Done     - Inform the ITU-T and DSL Forum that work on the VDSL2 MIB has begun
  Done     - Integrate working group changes and produce revised VDSL2 MIB draft
  Done     - Post Initial Drafts of all the xDsl Bonding MIB drafts
  Done     - Post Vdsl2 draft version 03
  Done     - Post Vdsl2 draft version 04.
  Done     - Complete Thorough Working Group Reviews of the Vdsl2 draft and produce version 05.
  Done     - Working Group Last Call for the Vdsl2 document.
  Done     - Early MIB Doctor Reviews of the Vdsl2 draft.
  Done     - Make Correction to the draft following the review.
  Done     - Working Group Last Call for the Vdsl2 document following corrections.
  Done     - Present the Vdsl2 document to the IESG.
  Done     - Submit updated ATM and Ethernet G.Bond MIB drafts.
  Done     - Submit G.Bond MIB and TDIM MIB Drafts
  Done     - Working Group Last Call on all the G. Bond documents.
  Done     - Submit G.Bond documents to IESG as Proposed Standard
  Oct 2012 - Initial Vector of Profiles draft to be accepted by the Working Group.
  Jan 2013 - Submit Vector of Profiles Draft version 01
  Apr 2013 - Revise the draft and post vector of Profiles draft version 02.
  Jul 2013 - Post Vector of Profiles Draft version 03.
  Oct 2013 - Submit Vector of Profiles Draft version 04.
  Nov 2013 - Working Group Last Call for the Vector of Profiles draft.
  Dec 2013 - Submit the Vector Of Profile document to the IESG as Proposed Standard.
  Dec 2013 - Re-charter or close down.


All charter page changes, including changes to draft-list, rfc-list and milestones:



Generated from PyHt script /wg/adslmib/charters.pyht Latest update: 24 Oct 2012 16:51 GMT -